Availability: In Stock

Pmp(R)/Capm(R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method

SKU: 9781614345046

Original price was: $99.00.Current price is: $8.00.

Pmp(R)/Capm(R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method, Barry Lyons, 9781614345046

Category: Brands:

Description

A thorough and in-depth preparation guide for PMP and CAPM exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.

Additional information

Publisher

ISBN

Date of Publishing

Author

Category

Page Number