Availability: In Stock

Critical Path Analysis in Practice: Collected Papers on Project Control

SKU: 9780415852975

Original price was: $40.00.Current price is: $9.00.

Critical Path Analysis in Practice: Collected Papers on Project Control, Gail Thornley, 9780415852975

Category: Brands:

Description

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences. This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press. Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Additional information

Publisher

ISBN

Date of Publishing

Author

Category

Page Number